Read the source. Ask a question.

Sources & context.

The public references behind the company information and homeowner explanations on this site.

Company, review and utility references checked November 23, 2026. Linked information can change.

Company & reviews

  • SpartanX’s official website — company information and published installation work. Company-wide territory is separate from the area Oscar serves.
  • SpartanX on Google — the business panel includes public Google reviews. The November 23 snapshot showed a 4.9 rating and more than 1,000 company-wide reviews. It is a dated snapshot, not a live counter.
  • The BBB profile for Spartan Solar / SpartanX — the linked record distinguishes BBB accreditation from its A+ rating. Neither is a government approval or a guarantee of an individual project.
  • Oscar Silva’s Recheck profile — public representative information and credential details.
  • SpartanX’s installation map — company-reported locations. The preview is not a live project tracker or an address-eligibility check.

Company-selected customer stories and supplied project footage are separate from public Google reviews.

Start with your utility

Oscar’s Interconnection Energy Report requests on this site cover Duquesne Light, West Penn Power, Penn Power, Penelec, Met-Ed, PPL, PECO, UGI, Citizens’ Electric, Pike County Light & Power, Tri-County REC, Chambersburg Borough, and Lansdale Borough. Penn Power. An address still needs to be evaluated. Supply and delivery may involve different companies.

Net metering, interconnection and permission to operate

Your utility’s applicable tariff, supplier arrangement and project approvals determine the details. Metering, inspection and permission to operate are distinct parts of the process; their exact sequence can differ.

Understand the basics

Installation, maintenance, insurance, repairs, warranties and any production guarantee depend on the selected plan’s written documents. The website’s explanation is not a substitute for those terms.

Real imagery. Carefully labeled examples.

The real installation photographs and clips come from the supplied SpartanX project collection. Oscar’s portrait comes from his public Recheck profile. The animated energy flow is an explanatory overlay, not a system design or a measured performance result.

Process-guide videos explain milestones. They do not confirm a visitor’s project status, approval or installation date. Inspection and permission to operate remain separate checkpoints.

The bill gallery contains selected, anonymized statement excerpts. Dates, usage, prior balances and other charges differ. Solar agreement payments are not shown, and a displayed credit does not establish a household’s annual savings or total energy cost.

Only the displayed Duquesne Light before/credit examples share an account; their seasons and usage still differ. The West Penn and Penelec examples are separate accounts. A Penn Power before-solar example is available without a paired after-solar example.

About scheduling

The main form requests an Interconnection Energy Report with Oscar. The separate Pittsburgh-area site survey link is for a site survey when your project team directs you to use it. It is not the introductory review destination.